Switch Roofing CRM in the Off Season: A 30 Day Migration Plan

A four week plan to switch roofing CRM in the off season, from data export to rollout by role, so you are live before spring storms.


Built inside a roofing company
Published NOVEMBER 25, 2026

The safest way to switch roofing CRM software is to use the off season and run a 30 day plan in four weeks. Spend week one exporting and auditing your data, week two setting up the new system, week three rolling it out one role at a time, and week four cutting over and closing out the old account. Finished before spring storms, your team learns the new system on quiet days, not in a claim surge.

Why the off season is the only sane time

Nobody should change systems in July. In July the phones ring, an adjuster is on a roof Thursday morning, a crew is waiting on a material delivery, and a supplement is due by Friday. Ask your office to learn new software in that week and you will get a half entered job file and a team that quietly goes back to the spreadsheet.

If your market slows down in winter, that is your window. Your storm cycle sets your calendar, not the software vendor's. Pick the stretch where the fewest crews are on roofs and the fewest homeowners are waiting on a callback, and put the whole migration inside it. Thirty days is enough if you are organized and one person owns the plan.

Most roofing companies do not switch because they found something better. They switch because the old system quietly cost them money for two years and the year end numbers finally proved it. If you are still deciding whether to switch at all, start with our 12 questions to ask before you sign a roofing CRM. If you have decided, here is the plan.

Week one, days 1 to 7: export and audit

This week is about your data, not the new software. Do these in order.

  1. Read your current contract. You need the term, the notice window for cancelling, and the format your data comes back in. The notice window decides your calendar, so do this before anything else.
  2. Request full exports on day one so a slow export does not eat your week. You want customers with contact details, open projects with stage and dollar value, closed job history, notes and message history, documents and photos, your price book and item catalog, and your user list with roles and locations.
  3. Decide what moves. Open jobs, anything with a warranty clock running, and anything with a pending supplement must come over. A lead that went dead years ago is a judgment call. Ask the new vendor in writing what it will load for you and what you load yourself, because the answer decides how much cleanup falls on your office. The question is what is worth the cleanup, not what is technically possible.
  4. Clean what you can before it moves. Merge duplicate customers. Fix the lead source and job type lists, because the new system builds its reports from your own option lists, and a source typed three different ways becomes three different rows in a report.
  5. Write your pipeline on one page, the way you actually run it, with insurance work and retail work shown separately. In Trussi every stage has a name your team sees and a role that tells reporting what the stage means: lead, won, completed, invoiced, closed, dead, or cancelled. Mapping your old stages onto those roles on paper now saves an argument later.
  6. Name one owner for the whole project, ideally someone in the office who is trusted by the field. A migration without one name on it takes sixty days.

Week two, days 8 to 14: set up the new system

Trussi deploys in 17 days, which fits inside a 30 day plan with room left for training and a cutover. Whatever system you pick, ask how many days its deployment takes and hold that number against your calendar.

Your job in week two is to make sure the decisions are ready when the system is. That means locations, users, and roles first. Trussi ships seven roles, Admin, Account Admin, Back Office, Branch Manager, PM, Crew Lead, and Subcontractor, and the permissions for each are editable per account, so write down who needs to see pricing and who does not. Then your item catalog and quote templates, so an estimate uses your labor rates and your margin from the first day. Then measurement ordering, which connects to EagleView, HOVER, GAF QuickMeasure, and RoofScope using your own provider credentials.

If you do your books in QuickBooks, check which version you run. The Trussi integration connects to QuickBooks Online, and a contractor on the desktop version moves the company file to Online first, then connects. That is a task to start in week one, not week three.

Week three, days 15 to 21: roll out by role

Do not turn everyone on the same morning. Roll out one role at a time, in the order below, and do not move to the next until the one before passes its test.

  1. Back office and the owner go first, because they validate the money. You are done with this group when an invoice from a migrated job ties out to QuickBooks and the owner dashboard matches what the office believes the receivable is.
  2. Production managers go second. Their job is the crew board and material orders. You are done when next week's real schedule lives in the new system and the crews know where they are going from it.
  3. Sales reps go third, because they are the people most likely to quit a system that slows them down. Give them the ranked lead list and the phone app, and have each one build and send a real estimate from a measurement report. You are done when a rep can do that in the driveway without calling the office.
  4. Crew leads and subcontractors go last. In Trussi those roles are app only by default, so their training is short and lives on the phone. You are done when every active job has its required photos coming in from the field.

The reason for this order is simple. Money gets checked first, the schedule second, and the people with the least patience last, once the system has already proven it works.

Week four, days 22 to 30: cut over and close out

Pick a cutover date and announce it. From that date, every new lead goes into the new system only, and the old one becomes read only. Count your open jobs in both systems and make sure the numbers match. Spot check ten jobs of different types, including an insurance job with a supplement and a retail job with a deposit, and confirm the notes, photos, and balances are all there.

Keep your export archive somewhere safe even after the old account is closed. Send the cancellation notice inside the window you found on day one, not after it. And hold a short check in every morning that week, because small problems found on Monday are annoying and small problems found on Friday are expensive. If something looks wrong in Trussi, the Report an Issue button at the bottom of the sidebar opens a support ticket, and replies come back into the same thread.

Where Trussi fits in the plan

White glove is a pillar for us, not a slogan, so here is what the site says. Trussi deploys in 17 days. Onboarding is hands on and included with your subscription. Teams come over in small batches with real help moving job history across, rather than a self serve importer and good luck. If a migration is unusually large or complex, we scope it with you first so there are no surprises. That matters, because onboarding and migration charges are exactly the line item worth asking about with any vendor, as we covered in what a roofing CRM actually costs.

There is one plan. Trussi is one plan at $40 per user per month with everything included, and the pricing page shows what that covers. It is a deliberate strategy to lead the market on what a roofing platform should cost, a price set on purpose and not a markdown, and we would rather you compare it to your current invoice line by line than take our word for it.

Start by December 22

The calendar is the whole argument. Start the plan by December 22 and you finish before the first spring storm, with your office, production team, and reps already working in one system. Book a demo at trussi.ai/contact so we can talk through your timing and your team is live before spring storms.